Startup profile for Mazama Energy: latest funding, latest known valuation, total disclosed funding, investors, status, sources, and why the company is interesting. Part of the Venture Capital Tracker startup directory.

Startup profile · funding coverage

Mazama Energy funding, valuation and investors

Superhot-rock enhanced geothermal at Oregon’s Newberry Volcano — $135M of new capital in September 2026 including an oversubscribed Series B.

Keep track of Mazama Energy

Save this profile to your VCT watchlist for a quick return.

View watchlist

Funding, valuation & investors

Answer-first snapshot

Latest funding

Series B (plus other new capital)

$135M new capital · September 2026

Latest known valuation

Not publicly disclosed

Total disclosed equity funding

$135M

Excludes debt, grants, acquisitions, secondaries, and IPO proceeds.

Current status

private

series b · Frisco / Dallas, Texas (Newberry, Oregon project)

Investors in latest funding

Lead: Centaurus Capital , Doerr Capital

Other: Khosla Ventures , Gates Frontier , ConocoPhillips , Shell Ventures , SiteGround Capital , H. Barton Asset Management , Jeffrey and Marieke Rothschild Foundation

Sources: latest funding Last verified: 2026-09-18

Overview

Mazama Energy is a Frisco/Dallas-area geothermal developer incubated at Khosla Ventures and led by CEO Sriram Vasantharajan, a chemical engineer from oil-and-gas wells. It is building enhanced geothermal systems in superhot rock near Oregon’s Newberry Volcano. In October 2025 it said it created the hottest engineered geothermal system on record at 629°F (331°C). On September 17, 2026 it announced $135 million of new capital including an oversubscribed Series B led by John Arnold’s Centaurus Capital and Doerr Capital, with ConocoPhillips, Shell Ventures, returning Khosla Ventures and Gates Frontier, plus SiteGround Capital, H. Barton Asset Management, and the Jeffrey and Marieke Rothschild Foundation. TechCrunch called the raise a Series B; Axios said Series B funding and grants. Proceeds fund Project Ceres (DOE-supported), which targets 15 MW per well and a 2027 power-generation demonstration. Company claims include independent certification of more than 10 GWe of resource potential at Newberry (up from Vinod Khosla’s 5 GW comment a year earlier), first-site output of 200 MW by 2030, and a second land position. This is not Fervo Energy (Nasdaq: FRVO).

Why Mazama Energy is interesting

Company-disclosed $135 million of new capital on September 17, 2026 includes an oversubscribed Series B led by Centaurus Capital and Doerr Capital. Canary Media says the bag includes Series B; Axios reports Series B funding and grants. Valuation was not disclosed. The technical tell is Newberry: 331°C EGS in 2025, a second well that hit 10,350 feet 80% faster, and a DOE-backed Project Ceres aiming at 15 MW per horizontal well.

Product & use cases

Enhanced geothermal systems in superhot rock: drill, create an engineered reservoir, and recover heat as supercritical fluid to generate firm electricity.

  • Utility-scale firm, carbon-free power from engineered geothermal
  • Data-center and industrial offtake that needs 24/7 supply
  • Complement to intermittent wind and solar on western U.S. grids

Key facts

  • Sep 17, 2026: $135M new capital including oversubscribed Series B (company / GlobeNewswire). Axios: Series B funding and grants. TechCrunch: Series B. No valuation.
  • Leads: Centaurus Capital (John Arnold) and Doerr Capital. Returning: Khosla Ventures, Gates Frontier. Strategics: ConocoPhillips, Shell Ventures.
  • 2025 Newberry EGS at 629°F / 331°C; second well reached 10,350 ft ~80% faster (company / Canary).
  • Project Ceres: DOE-supported; 15 MW/well target; power-generation demo planned 2027. Company: >10 GWe Newberry resource; 200 MW first site by 2030.

Funding history (newest first)

Series B (plus other new capital)

2026-09 $135M new capital
  • Centaurus Capital (lead)
  • Doerr Capital (lead)
  • Khosla Ventures (participant)
  • Gates Frontier (participant)
  • ConocoPhillips (participant)
  • Shell Ventures (participant)
  • SiteGround Capital (participant)
  • H. Barton Asset Management (participant)
  • Jeffrey and Marieke Rothschild Foundation (participant)

Source: Https://www.globenewswire.com/news-release/2026/09/17/3364060/0/en/mazama-energy-raises-135-million-to-scale-the-world-s-hottest-engineered-geothermal-system.html

Competitive landscape

Edge: Hottest disclosed EGS well (331°C, 2025) and a push toward 400°C supercritical conditions that the company says can deliver up to 10× conventional geothermal output per well — still pre-commercial power.

  • Fervo Energy direct

    Public EGS operator (Nasdaq: FRVO). See /startup/fervo-energy. Different site and temperature target; Fervo already sells power.

  • Sage Geosystems direct

    Canary: recently started producing power from a Texas pilot. Different temperature and commercial status.

  • Quaise Energy adjacent

    Also drilling near Newberry. Canary cited an ~$180 million round in August 2026. Different drilling approach (millimeter-wave).

  • Conventional hydrothermal / gas peakers incumbent

    Natural steam pockets or fossil firming. Superhot EGS is the bet that engineered reservoirs beat both on cost at scale.

Market / IPO context

Editorial / static context — not a live quote.

Related funding articles

Venture Capital Tracker pieces that cover Mazama Energy's financing or category context.

FAQs about Mazama Energy

Practical answers founders, operators, and investors typically search for.

The company announced $135 million of new capital on September 17, 2026, including an oversubscribed Series B. Axios described Series B funding and grants. Valuation was not disclosed.
It develops enhanced geothermal systems in superhot rock near Oregon’s Newberry Volcano, aiming for supercritical heat around 400°C and 15 MW per horizontal well.
No. Fervo is a public Houston EGS company (Nasdaq: FRVO). Mazama is a private Khosla-incubated developer targeting hotter rock at Newberry.
Not as of the September 2026 announcement. Project Ceres is a DOE-supported demonstration; the company plans to start testing early next year and talks about first-site output of 200 MW by 2030.

By Venture Capital Tracker

Last updated:

Editorial note: AI tools assisted with research, structure, or drafting. Venture Capital Tracker retains human editorial responsibility for factual accuracy, relevance, and source quality before publication.