Startup profile for Antares Nuclear: latest funding, latest known valuation, total disclosed funding, investors, status, sources, and why the company is interesting. Part of the Venture Capital Tracker startup directory.

Startup profile · funding coverage

Antares Nuclear funding, valuation and investors

Develops factory-built nuclear microreactors for reliable power at military, space and remote industrial sites.

Verified company research · funding, investors and latest developments

Keep track of Antares Nuclear

Save this profile to your VCT watchlist for a quick return.

View watchlist

Funding, valuation & investors

Answer-first snapshot

Latest funding

Series A

$30M · October 30, 2024

Latest known valuation

Not publicly disclosed

Total disclosed equity funding

$38M

Excludes debt, grants, acquisitions, secondaries, and IPO proceeds.

Current status

private

growth · Torrance, California, United States

Latest tracked event: Series C (equity and debt package) (July 27, 2026). It is shown separately because it is not counted as disclosed equity funding.

Sources: latest funding · antaresindustries.com Last verified: 2026-10-29

Overview

Antares Nuclear, founded in 2023 by Jordan Bramble and Julia DeWahl, develops transportable heat-pipe microreactors based on TRISO fuel. The Torrance company demonstrated criticality with its Mark-0 reactor at Idaho National Laboratory in June 2026 and raised a $470 million equity-and-debt Series C in July.

Why Antares Nuclear is interesting

Antares reached zero-power criticality in June 2026 and disclosed $470M in July Series C financing, including $370M equity and $100M debt. Its Mark-1 electricity test and military deployments remain planned rather than completed.

Product & use cases

Antares designs modular TRISO-fueled, sodium heat-pipe-cooled nuclear systems for remote power rather than utility-scale baseload generation. Mark-0 validated reactor physics and control behavior at zero-power. Mark-1 aims to test full-power conversion, operational endurance and electricity generation.

  • Long-duration power for U.S. military installations
  • Remote critical infrastructure where diesel fuel resupply is vulnerable
  • Space and other special-purpose energy systems

Key facts

  • June 4, 2026: DOE-authorized Mark-0 zero-power criticality test at Idaho National Laboratory; no electricity generated by the Mark-0 test reactor.
  • July 27, 2026: $470M Series C package, comprised of $370M equity and $100M debt, co-led by Paradigm and Caffeinated Capital.
  • December 2, 2025: $96M Series B, comprised of $71M new equity and $25M debt according to contemporary coverage.
  • Mark-1 electricity-producing demonstration targeted for 2027; military deployments targeted from 2028, not yet achieved.
  • September 2026: announced multi-year HALEU supply agreements with Centrus and additional fuel-supply partnerships.

Funding history (newest first)

Series C (equity and debt package)

2026-07-27 $470M total ($370M equity; $100M debt)
  • Paradigm (lead)
  • Caffeinated Capital (lead)
  • Point72 Ventures (participant)
  • Shine Capital (participant)
  • Industrious Ventures (participant)

Source: Read source · antaresindustries.com

Series B (equity and debt package)

2025-12-02 $96M total ($71M equity; $25M debt)
  • Shine Capital (lead)
  • Caffeinated Capital (participant)

Source: Read source · antaresindustries.com

Series A

2024-10-30 $30M

Source: Read source · antaresindustries.com

Seed

2023-10-31 $8M

Source: Read source · antaresindustries.com

Investors in our directory

Funds linked from Antares Nuclear's profile — open a fund page for stage focus and related deal articles.

Competitive landscape

Edge: A dated DOE criticality test and announced fuel supply contracts are stronger progress signals than a paper reactor design. Commercial readiness still depends on full-power electricity production, fuel availability, regulatory authorizations, deployment logistics and actual operating cost.

Comparing zero-power criticality dates is valid only as a narrow physics milestone. Power output, reactor lifetime, licensing pathway, supply of qualified fuel and revenue differ across vendors. Antares' $470M financing is not $470M of VC equity.

  • Radiant direct

    Factory-built transportable microreactor; electricity-producing demonstration remains a separate milestone.

  • Valar Atomics direct

    Advanced gas-cooled microreactors; demonstrated zero-power criticality in June 2026.

  • Aalo Atomics adjacent

    Sodium-cooled reactors designed for modular AI/data-center power rather than primarily military missions.

Industries

Market / IPO context

Editorial / static context — not a live quote.

FAQs about Antares Nuclear

Practical answers founders, operators, and investors typically search for.

No. Antares disclosed a $470 million Series C package in July 2026, comprising $370 million equity and $100 million debt.
No. Its June 2026 Mark-0 zero-power criticality did not generate electricity. An electricity-producing Mark-1 test is planned for 2027.
The company targets initial deployments to military installations in 2028, subject to execution, approvals and testing.

By Venture Capital Tracker

Last updated:

Editorial note: AI tools assisted with research, structure, or drafting. Venture Capital Tracker retains human editorial responsibility for factual accuracy, relevance, and source quality before publication.